AI workspace for preconstruction and estimating teams.Go Into Bid Day With Every Scope Covered.
Docsbench AI agents read the tender package and every subcontractor quote, level each trade against your scope sheets, and build the bid basis, clarifications, and proposal before the deadline.
Bring the project manual, drawings, addenda, bid forms, subcontractor quotes, takeoff exports, scope sheets, and past bids into one project. Docsbench’s agents read across all of it, so every requirement, quote, and change is in one place when the deadline arrives.
Read and classify
Know Every Requirement Before the Quotes Come In.
Docsbench reads the full project manual, drawings, and bid documents, sorts every requirement by trade package, and keeps the page reference for each one. Unusual commercial terms and requirements that could fall between trades are flagged before anyone prices the job.
Quotes arrive as PDFs, emails, spreadsheets, and scans, each worded differently. Docsbench maps every line to your scope sheet and marks each item as included, excluded, allowance, alternate, unclear, or not priced. The bidder’s original wording and quoted amount stay beside your adjustments, so you see the real low bidder.
Leveling Workbook.xlsx · Glazing
Scope
Bidder 1
Bidder 2
Bidder 3
Storefront
Included
Included
Included
Sealants
Excluded
Included
Included
Door hardware
Included
Allowance
Included
Mockup
Not priced
Included
Unclear
Quoted
$842k
$856k
$879k
Adjusted
$871k
$856k
$879k
Adjusted low: Bidder 2, though Bidder 1 quoted lowest
Revision
Take the Late Addendum in Stride.
An addendum two days out. A revised quote at 11 a.m. A bidder who withdraws. Tell Docsbench what changed, and it updates the leveling, the clarifications, and the bid summary, flags the quotes that no longer match the documents, and shows what moved.
Addendum 4: door hardware moves to Division 083 files updated
Leveling Workbook.xlsx · Door hardware
Carried in06 Carpentry08 Openings
Clarifications.docx · Item 12
Finish hardware is included in Division 08 per Addendum 4, with keying by the owner.
Bid Summary.xlsx · By division
08 Openings$1,412k$1,598k
Built for Every Part of the Bid.
From the first read of the tender to the proposal for negotiated work, each part of the bid has its own documents and its own deadline. Choose the work you want to see.
Know the Job Before You Price It.
“Read the project manual and drawings, and build a requirements register by trade package with the page reference for each item.”
“List the commercial terms that carry risk (liquidated damages, bonds, retainage, insurance) and anything unusual against our standard terms.”
“Draft the go/no-go summary for Thursday’s meeting, with the key risks and the bid schedule.”
Start pricing with the whole tender understood, not just the parts someone had time to read.
Requirements Register.xlsx.xlsx
1,880 requirements
By trade package, with page references
Tender Review Summary.docx.docx
Contents
Scope · Commercial terms · Risks · Questions
Go/No-Go Deck.pptx · Slide 3.pptx
Risks
15 risk items, three to price.
Commercial6
Schedule4
Scope3
Site2
Retainage 10% to completion
LDs $3,000 a day
Contractor’s builder’s risk
Illustrative example · fictional bids and figures
Excel.xlsx
Requirements Register. Every requirement by trade package, with its page reference and flags.
Word.docx
Tender Review Summary. Scope, commercial terms, risks, and open questions for the owner.
PowerPoint.pptx
Go/No-Go Deck. The opportunity, the risks, and the resources needed, with editable charts.
Compare Every Bidder on the Same Scope.
“Pull the roofing, glazing, and drywall quotes from these emails and PDFs into our scope sheets, keeping each bidder’s original wording.”
“Mark every item as included, excluded, allowance, alternate, unclear, or not priced, and show the adjusted low bidder for each trade.”
“Two quotes came in after Addendum 3. Check which bidders priced it, and update the leveling.”
Spend bid week deciding who to carry, not retyping quotes into spreadsheets.
Scope Gap and Follow-Up List.docx.docx
Bidder C · 2 items
Firestopping excluded · insulation not priced
Leveling Workbook.xlsx · Drywall.xlsx
$k
A
B
C
D
Metal framing
Incl.
Incl.
Incl.
Incl.
Board and finish
Incl.
Incl.
Incl.
Incl.
Firestopping
Incl.
Incl.
Excl.
Incl.
Insulation
Incl.
Allow.
Not priced
Incl.
Quoted
2,140
2,065
1,980
2,210
Plugs
+134
Adjusted
2,140
2,065
2,114
2,210
Adjusted low: Bidder B · firestopping plug carried for C
Illustrative example · fictional bids and figures
Excel.xlsx
Leveling Workbook. One sheet per trade: bidders side by side, status for every scope item, quoted and adjusted totals.
Word.docx
Scope Gap and Follow-Up List. What each bidder left out or left unclear, ready for the calls before bid day.
Send a Bid That Says Exactly What You Priced.
“Draft the bid basis from the selected quotes and our estimate, listing every allowance and assumption.”
“Write the qualifications and clarifications from the leveling exceptions, in our standard format.”
“Build the bid summary by division with markups for the final review, then update it when the last mechanical number comes in.”
Fewer surprises at buyout, because the bid states what it includes and what it doesn’t.
Qualifications and Clarifications.docx.docx
14. Winter conditions
Heating and enclosure carried to Feb 28.
Bid Basis.docx.docx
Northfield Library Expansion
Scope, quotes, allowances, assumptions
Bid Summary.xlsx · By division.xlsx
03 Concrete$2.41M
05 Metals$1.86M
09 Finishes$2.94M
23 HVAC$3.38M
26 Electrical$2.77M
All other$3.85M
Subtotal
$17.21M
Fee and bond
$0.91M
Bid
$18.12M
Illustrative example · fictional bids and figures
Word.docx
Bid Basis. The scope, quotes, allowances, and assumptions behind the number.
Word.docx
Qualifications and Clarifications. What the bid includes and excludes, in your standard wording.
Excel.xlsx
Bid Summary. Cost by division, markups, alternates, and the final number, with an editable chart.
Win the Negotiated Work Too.
“Draft the preconstruction services proposal for this CM at-risk RFP from our past school projects and team resumes.”
“Write the phasing narrative for occupied-campus work, with a summary schedule table by phase.”
“Prepare our electrical trade proposal to the GC, with scope, exclusions, and alternates matched to their bid form.”
Answer more RFPs and invitations to bid without pulling estimators off the bids already in progress.
No. It reads drawings to find requirements, notes, and details, and works with the quantities from your takeoff or estimating system exports.
Can it handle quotes in any format?
Yes. PDFs, emails, spreadsheets, and scanned quotes all go into the same leveling, mapped to your scope sheets and cost codes.
How does it keep our adjustments separate from bidder prices?
Each bidder’s quoted amount and original wording stay unchanged. Plugs and adjustments sit in their own columns, labeled with the instruction behind them.
Does it work with our estimating and bid-management tools?
Bring exports from your estimating, takeoff, and bid-management systems. Docsbench works with the files you upload, alongside the tools you already use.
Who decides the number?
You do. Estimators choose the bidders to carry, set the plugs and markups, and sign the bid. Docsbench prepares and updates the work under your direction.
Bid More Work With the Same Team.
Spend less time reading tenders, retyping quotes, and rewriting clarifications after every addendum. Give your estimators more time to price the risk and pick the jobs worth winning.