Your Project Record. Working for You.

Bring the contract, spec book, drawings, daily logs, RFIs, submittals, emails, photos, schedule updates, and cost reports into one project. Docsbench’s agents read across the whole record as it grows, so every package you build can draw on everything that has happened on the job.

Classify

Sort the Record as It Grows.

Daily logs, emails, RFIs, and photos arrive by the hundred. Docsbench tags each record by issue, location, trade, and spec section, and keeps the link to the original. When an issue turns into a change or a claim, every record behind it is already in one place.

Project Record · Tagged by issue
2,416 recordsEmails, daily logs, and RFIs9 to review
  • Email · Mar 12Glazing subcontractor: “unit frames on hold”

    Curtain wall delayLevel 408 44 13
  • Log · Mar 14“Glazing crew reassigned”

    Curtain wall delayLevel 4
  • RFI-118Anchor embed spacing

    Curtain wall delayStructural
Analysis

Connect Every Event to Its Evidence.

Docsbench links each question, direction, and field record into a dated chain, ties it to the contract and spec requirement it affects, and adds up the time and cost behind it. When the owner asks why, the answer and its backup are already assembled.

Issue Log.docx · Issue 14

Elevator pit waterproofing

  1. Mar 18Membrane detail conflicts with sump

    RFI-061
  2. Mar 27Revised waterproofing detail issued

    ASI-04
  3. Mar 28–Apr 4Pit work on hold, crew reassigned

    Daily logs ×6
  4. Apr 5Revised membrane installed

    Site photo

4 days · $38,400 · Notice sent Apr 2

Revision

Update the Package When the Design Changes.

An ASI supersedes the last one. A subcontractor reprices. The owner rejects part of a change. Tell Docsbench what changed and which files to update. It revises the change order log, the owner report, and the submittal register, and shows what moved.

ASI-09 supersedes ASI-073 files updated
Change Order Log.xlsx
PCO-031 · Shear wall revisions$92,000$118,500
Owner Report.docx · 5. Changes

Pending changes total $341,000$367,500, led by PCO-031 under ASI-09.

Submittal Register.xlsx
03 21 00 · Rebar shop drawingsApprovedResubmit

Built for Every Package on the Job.

Submittals, owner reports, changes and claims, and closeout each draw on the same project record and each need their own package. Choose the work you want to see.

Turn the Project Record Into Recovered Time and Cost.

  • “Price the change order for ASI-12 from the subcontractor quotes and our labor rates, with the backup attached.”

  • “Pull every event related to the curtain wall delay from the daily logs, emails, and RFIs into one dated chronology.”

  • “Draft the REA narrative and cost workbook from the chronology and our scheduler’s time impact analysis, with an exhibit index.”

Recover the time and money the record supports, without a month of document digging.

Chronology and Cost Workbook.xlsx.xlsx

Cost summary

Extended GCs $214k · Inefficiency $96k · Markup $31k

Change Order Package – PCO-044.docx.docx

Cover sheet

Scope, pricing, schedule effect, backup

Request for Equitable Adjustment.docx.docx

Curtain wall anchor redesign

4. Entitlement

The owner’s design change delayed curtain wall installation, which was on the critical path.

Feb 6Curtain wall anchors rejected at Level 6Ex. 12
Feb 9RFI-204 asks for a revised embed detailEx. 13
Mar 3ASI-11 issues the detail, 22 days laterEx. 18
Illustrative example · fictional project and figures
  • Word.docx

    Delay Claim / REA. The chronology, entitlement narrative, and exhibit index, ready for executive review.

  • Excel.xlsx

    Chronology and Cost Workbook. Every event with its source, and the time and cost computation.

  • Word.docx

    Change Order Package. Scope, pricing, schedule effect, and backup for each change.

Editable Word documents. Excel workbooks. PowerPoint decks, with editable charts. Open the files, check the work, and keep refining.

Your Team Submits. Docsbench Prepares.

Does Docsbench do the schedule analysis?

Your scheduler runs the time impact analysis in your scheduling software. Docsbench works from the schedule exports and the scheduler’s analysis, compares the updates, and builds the chronology, narrative, and cost around them.

Can it use our emails and photos?

Yes. Export the project emails and upload photos alongside the logs and RFIs. Docsbench reads them, tags them by issue, and links them into the chronology.

Does it work with Procore and our other tools?

Bring exports and documents from Procore, your scheduling software, and your cost system. Docsbench works with the files you upload, alongside the tools you already use.

Will it confuse reviewed, approved, and accepted?

No. Docsbench uses your project’s status terms as they appear in the record, and never marks an item approved or accepted unless the record says so.

Who decides what goes to the owner?

You do. Project managers and executives decide which changes and claims to submit, the scheduler owns the schedule analysis, and the owner and architect decide on acceptance. Docsbench prepares and revises the work under your direction.

Keep the Job Moving and Get Paid for It.

Spend less time digging through logs, rebuilding chronologies, and assembling closeout binders. Give your project team more time to run the work and recover what the record supports.